Developed a system to visualize and manage truck/machine locations at construction sites.
Client
A construction and real estate company
Industry
Construction
Country
Japan
Client Background
A company in the construction and real estate sector seeking to modernize operations by tracking trucks and heavy equipment in real time. Their goal was to improve site coordination, enhance operational efficiency, and prepare for broader digital transformation.
Challenge
The client needed a real-time location tracking system to monitor vehicles and machinery at multiple construction sites. The system had to gather sensor data via API, store and manage operation logs, and allow flexible configuration and data export.
Our Solutions
We built a web-based POC system integrating sensor data through APIs. The solution features a real-time map view for visual tracking, customizable data acquisition settings, and exportable logs. The POC successfully validated technical feasibility for future scaling.
Core Technologies
2/3
Real-Time Equipment Tracking Map
Live Fleet Monitoring Dashboard
Sensor Data Integration System
Equipment Movement History Logs
Core Technologies
Backend
PHP
Frontend
JavaScript, HTML/CSS
Infrastructure
On-Premises
Devices
PC
Features of the App
Live Map
Real-time display of truck/machine locations
Sensor Integration
Collects data from SD card-equipped devices
Data Export
CSV download for operation history
Configurable Input
Flexible sensor data settings
Business Values
Increased Efficiency
Real-time asset monitoring helped the client improve fleet
utilization and reduce idle time.
Reduced Operational Costs
Predictive maintenance capabilities allowed the client to address
issues before they escalated, cutting repair costs and downtime.
Improved Decision Making
The system's comprehensive dashboard provided actionable insights,
helping the client optimize their asset management strategies.